top of page

PacLease

PacLease Truck Rental

2016

The scope included:

Removal of the existing BUR system

Installation of new ISO insulation

Application of Firestone 0.060 EPDM membrane, fully adhered with low-rise adhesive

Installation of new 24-gauge metal flashings for a secure and weather-tight perimeter finish

Project Highlights:

Upgraded roof system enhances energy efficiency and long-term durability

Fully adhered EPDM provides superior waterproofing and wind uplift resistance

Completed safely and on schedule with minimal disruption to operations

bottom of page