top of page

PacLease
PacLease Truck Rental
2016
The scope included:
Removal of the existing BUR system
Installation of new ISO insulation
Application of Firestone 0.060 EPDM membrane, fully adhered with low-rise adhesive
Installation of new 24-gauge metal flashings for a secure and weather-tight perimeter finish
Project Highlights:
Upgraded roof system enhances energy efficiency and long-term durability
Fully adhered EPDM provides superior waterproofing and wind uplift resistance
Completed safely and on schedule with minimal disruption to operations
bottom of page
.png)
























